b'Case StudiesAlderman Knight School Post 16 Centre, TewkesburyA bespoke timber frame solution for theMain contractor, EG Carter & Co Ltd. appointed Alderman Knight School Post 16 Centre intried and trusted sub-contractor, Taylor Lane to Tewkesbury.The project architect specifiedmanufacture and erect the timber frame kit.timber frame construction for the Post 16 Centre as speed and ease of constructionFor structural integrity, the curved wall had to be was crucial. constructed from steel.Designed and fabricated by our dedicated steel department, the steel frame had to carry the load of the floor to ceiling windows and glazing.'