The Close, Llangrove - MF Freeman development - external Living room - Llangrove development, MF Freeman Bedroom one - Llangrove development, MF Freeman Dining room - Llangrove development, MF Freeman Bedroom one - Llangrove development, MF Freeman En-suite - Llangrove development, MF Freeman Bedroom one - Llangrove development, MF Freeman Bedroom four - Llangrove development, MF Freeman The Close, Llangrove - MF Freeman development - external Kitchen diner - Llangrove development, MF Freeman View to dining room - Llangrove development, MF Freeman

The Close, Llangrove

Taylor Lane Timber Frame supplied 140mm pre-insulated timber frame kits for The Close, an award-winning housing development in the idyllic village of Llangrove, located between Ross-on-Wye and Monmouth.  The Close comprises six contemporary, four double bedroom homes by Freeman Homes, a division of MF Freeman Ltd.

The Taylor Lane timber frame kits included 241mm I-joists.  Steel beams, designed and fabricated by our steel department were also supplied, providing support for the over-hanging first floor and some of the large window openings.

Designed by RRA architects, the timber frame properties are completed with a render and clad exterior, complemented by grey windows and doors.  Each home boasts a high-specification kitchen and bathroom/s, high-quality fixtures and fittings, and energy saving technology.

Testimonials

Taylor Lane Services

"We have had a very good experience with Taylor Lane, with great service from start to finish. We especially enjoyed the tour of the professional factory."

5/ 5 Stars

"Taylor Lane were key to the design process. They do all the engineering calculations...and tell you if something’s possible or not, calculate the truss requirements etc. "

5/ 5 Stars

"We have a long history with Taylor Lane. They have worked with Lovell and been part of our supply chain for well over 15 years, that I know to. When I have visited Hereford (on a number of occasions), it’s a welcoming business that’s open, honest and transparent on all matters commercial, design, technical. We quickly derived confidence that they were the right choice for us...and that’s been vindicated by performance onsite thereafter."

5/ 5 Stars

"We had worked with them [Taylor Lane] previously and were happy to continue that relationship knowing the quality of the frame and the service that we would receive."

5/ 5 Stars
TRA Catg Catg Chas PEFC Constructionline CE

Timber Frame STA catg STA Gold